Kimpor Kang Civil Engineering

Portfolio // Kimpor Kang

Project coordination, from drawing to handover.

Portrait of Kimpor Kang

I am a Civil Engineering student at Paragon International University on a full national scholarship, and a Project Coordinator at Singbuild Construction Co., Ltd. I handle the work that keeps sites moving, managing schedules, progress reports, quantity takeoffs, and BOQs. I also oversee submittals and handover packages for hotel, retail, F&B, office, and residential fit-outs in Phnom Penh.

Rendered interior of a luxury penthouse living room with floor-to-ceiling glazing, UVP2 Penthouse P5, Phnom Penh
Featured // UVP2 Penthouse P5

01 // Experience & Education

Work and Study.

Site work at a design and build contractor, alongside full-time civil engineering study.

Work

Singbuild Construction Co., Ltd.

Project Coordinator · Jul 2025 to present · Phnom Penh

  • Progress reporting with S-curves, daily labour returns and weekly site reports issued to client consultants.
  • Process purchase orders and payment documents, working with procurement, finance, and suppliers.
  • Quantity takeoff, BOQ documentation, material approvals and procurement tracking for the UVP2 packages and retail fit-out.
  • RFI and RFA registers, method statements, transmittals, authority permits, defect lists and handover packages through to defect liability close-out.

Study

Paragon International University

B.Sc. Civil Engineering · Third year · Full national scholarship

  • Structural analysis fundamentals: load paths, reinforced concrete behaviour, steel and section design.
  • Civil engineering laboratory experiments: concrete testing, materials testing, and practical quality control measurements.
  • Coursework applied on site: reading construction drawings, measuring works for quantity takeoff (QTO), and checking built work against specifications.
  • Full tuition scholarship held across the whole degree.

Tools I Built

Personal builds · 2025 to present

  • A React and Firebase web app that lets staff allocate their own site ride codes.
  • A Telegram to Google Sheets pipeline that logs daily sub-contractor headcount per trade.

02 // Field Projects

Projects.

Seven projects at Singbuild Construction, from the first site survey to handover and warranty. Tap any photo to open the full gallery.

Norodom Business Center guestroom fit-out LVL 13–23F

Norodom Business Center

Ongoing

Hotel guestroom fit-out · 11 floors

Document control for the guestroom fit-out on levels 13 to 23: master schedule, procurement, MEP method statements and signage across eleven floors.

Scope
Hotel guestroom interior fit-out
Location
Phnom Penh · Levels 13–23F
Deliverables
Master schedule, method statements, procurement
UVP2 Penthouse P5 interior fit-out PENTHOUSE P5

UVP2 Penthouse P5

Ongoing

Luxury penthouse interior · ID & MEP

Quantity takeoff and BOQ for interior and MEP works, door, window and carpentry schedules, RFA and RFI tracking and the catch-up master programme.

Scope
Penthouse interior and MEP fit-out
Location
Urban Village Phase 2, Phnom Penh
Deliverables
QTO, BOQ, RFA / RFI tracking, catch-up programme
UVP2 floor re-tiling and slab repair work SLAB REPAIR

UVP2 Retilling Work

Floor re-tiling & structural repair

Inspections, material approvals and progress reports for hacking, re-tiling and slab repair. Finished months ahead of schedule.

Scope
Floor re-tiling, hacking and slab repair
Location
Urban Village Phase 2, Phnom Penh
Deliverables
Inspection records, material approvals, progress reports
UVP2 common areas handover finishes TOWERS H · F · G · E

UVP2 Common Areas

Common areas · Towers H, F, G and E

Document control through handover for the common areas of Towers H, F, G and E at Urban Hub: submissions, transmittals, procurement tracking and the completion report of November 2025.

Scope
Common area finishes and services
Location
Urban Village Phase 2, Phnom Penh
Deliverables
Submittals, transmittals, completion report
UVP2 swimming pool and restroom facility finishes POOL DECK

UVP2 Swimming Pool

Swimming pool & restroom facility

Five shop-drawing revisions, tiling method statements and testing and commissioning support for pool MEP, then defect close-out through the liability period.

Scope
Pool finishes and facility MEP
Location
Urban Village Phase 2, Phnom Penh
Deliverables
Shop drawings, method statements, commissioning
Singapore Airlines Phnom Penh office renovation OFFICE REFIT

Singapore Airlines Office

Office renovation

Submissions, site-entry permits, replacement loose-furniture drawings and the handover timeline, tracked through to completion.

Scope
Airline office interior renovation
Location
Phnom Penh
Deliverables
Submittals, permits, loose furniture drawings
KFK KMALL 2 food and beverage fit-out F&B · KMALL 2

KFK KMALL 2

F&B fit-out · ID & MEP

Fit-out coordination from mall permits and material boards through thirteen weekly reports, MEP training and defect close-out. Handed over in February 2026.

Scope
Food and beverage unit fit-out
Location
KMALL 2, Phnom Penh
Deliverables
Weekly reports, material boards, MEP training

03 // Site Utilities

Tools That Speed Up Repetitive Tasks.

Small tools I built to take repetitive work off the team.

Tool // App

SB Grab Code Tracker

Ride-code allocation · React & Firebase

SB Grab Code Tracker screen showing 53 of 110 ride codes still available
Live board · 53 of 110 codes available

Staff used to send every ride-code request through one person. I built a live board where they can see free codes and claim one themselves.

The friction

Every request waited on one person, who also had to track which codes were free.

The impact

Staff help themselves from the board, and everyone can see which codes are free.

  • React
  • Firebase
  • Vercel
  • Role-based access
Tool // Bot

Manpower Reporting Automation

Telegram → Google Sheets · Google Apps Script

// Telegram webhook · NBC site group

> "NBC: 12 carpenters, 6 MEP, 4 painters"

>> parsed [CARP: 12] [MEP: 6] [PNT: 4]

>> 22 rows appended to NBC_Manpower_2025

Supervisors post the daily headcount in a Telegram group. The bot reads each trade, writes it into a shared Google Sheet, and keeps the manpower records up to date.

The friction

Collecting scattered chat messages for the monthly labour report took about 45 minutes at the end of every site day.

The impact

Headcount per trade is saved the same day, so the monthly labour report is ready right away.

  • Telegram Bot API
  • Google Apps Script
  • Google Sheets
  • Regex parsing

04 // Contact

Get in Touch.

Contact Details

Phone & Telegram
+855 95 727 281
LinkedIn
Kimpor Kang
Location
Phnom Penh, Cambodia
Degree
B.Sc. Civil Engineering, Paragon International University